







01.
Rotor line
R01: Apply adhesive to the shell, insert the magnet, assemble the hub
R02: Glue curing
R03: Dial gauge, finishing, vibration detection equipment
R04: Dynamic balancing tester Visual inspection by hand
R01
R02
R03
R04








01.
Rotor line
R01: Apply adhesive to the shell, insert the magnet, assemble the hub
R02: Glue curing
R03: Dial gauge, finishing, vibration detection equipment
R04: Dynamic balancing tester Visual inspection by hand
R01
R02
R03
R04









02.
Stator line
S01: Stator winding Machine
S02: Cable management and paint removal
S03: Solder an extension cable and fit heat shrink tubing
S04: Finished Stator Testing
S05: Skeleton assembly
S06: Glue curing
S01
S02
S03
S04
S05
S06









03.
Motor Assembly line
M01: Bearing assembly
M02: Stator and rotor assembly
M03: Gasket Loading and Tightening
M04: No-load test
M05: Laser marking
M06: Packaging
M01
M02
M03
M04
M05
M06